The scope of WDC's feasibility
studies includes:
 |
Ore reserve estimates |
 |
Mine planning |
 |
Milling |
 |
Leaching |
 |
Solvent extraction
and electrowinning |
 |
Molybdenum concentrate
leaching and roasting |
 |
Copper smelting and
refining |
 |
Gold ore processing |
 |
Roasting |
 |
Calcining |
 |
Other mining and metallurgical
processes |
|
|
 |
WDC's feasibility study for the
Magma Superior underhand cut and fill mine in Arizona resulted in reopening
a successful small high-grade operation. WDC was responsible for designing
the dewatering programs and other engineering assignments in this mine,
as well as for cost accounting and scheduling for its development and startup. |
| In 1992, WDC
successfully completed
a detailed feasibility study and basic engineering for the $300 million
Robinson copper and gold project near Ely, Nevada, for Magma Copper Company. WDC designed a 35,000-tpd sulfide copper concentrator, later expanded to
46,000 tpd, the largest new copper concentrator in the United States in
recent years. The design and engineering included more than 80 drawings
of the plant and infrastructure and all mine drawings.
This was the first grass-roots
project to be based on the use of a single grinding line for such a large
milling capacity. WDC developed detailed specifications for SAG mills and
ball mills.
WDC prepared all bidding documents
for detail engineering and construction management, managed the bidding
process, evaluated the bids and recommended the successful bidder. WDC also was awarded the detail design, procurement and construction management
for the pit dewatering system. |
 |
 |
Ore reserves, mine
planning and mine equipment selection |
 |
Metallurgical sampling
program, including drilling and bulk sampling |
 |
Metallurgical test program, development
of flowsheet, design criteria and selection of mill equipment |
 |
Powerline routing
and cost estimating |
 |
Exploration and development of
a water supply for the mill and potable water |
 |
Detailed tailings
dam design |
 |
Geotechnical engineering program
for pit slope design and mill foundations |
 |
Concentrate rail loadout
facility design |
 |
Operating cost estimates
for all areas |
 |
Capital cost estimate
for total project |
 |
Financial analysis |
Utilizing a team approach, involving
client staff, WDC staff and numerous subcontractors — all managed by
WDC — was the hallmark of the large-scale project.
 |
In 1991, WDC
was contracted to prepare a Bankable Feasibility Study for the Kori Kollo
project, majority owned by Battle Mountain Gold Company. The study was
used by Battle Mountain Gold to obtain project financing from international
lending institutions including OPIC, IFC and CAF. WDC and BMG engineers
worked together to
produce the Bankable Feasibility
Study. Tasks completed included: |
 |
preparation and review of ore
reserve estimates |
 |
preparation and review of mine
capital and operating cost estimates |
 |
review and modification of plant
capital and operating estimates |
 |
preparation of cash flow analysis |
These are merely a few examples in
a long history of successful WDCI feasibility studies worldwide.

~
HOME
~ About WDC
~ Employment Opportunities ~ Project
Management ~
~ Financial Analysis ~ Metals
Markets ~ From Budapest to Bangkok ~

Winters, Dorsey & Company, LLC
Mining and Metallurgical Industry Engineers
5151 East Broadway - Suite 1506
Tucson, Arizona USA 85711
Phone: 520-722-5600
Fax: 520-722-5623


Info@wdc-inc.com

|